NEW QUESTION 1
Which type of design includes vendor models, host names, IP Addresses, port connections, logical unit number sizes, and number of CPUs? (Choose the best answer.)
- A. Physical Design
- B. Conceptual Design
- C. High-Level Design
- D. Logical Design
Answer: A
NEW QUESTION 2
A Solution Architect will be deploying an Ethernet Virtual Private Network (EVPN) in their NSX-T Data Center environment.
What two selections must be prepared for the EVPN deployment? (Choose two.)
- A. deployed Tier-0 gateway
- B. deployed Load Balancer
- C. deployed Tier-1 gateway
- D. remote gateway with support for IGP and VLAN priority
- E. remote gateway with support for MP-BGP and VXLAN
Answer: BE
NEW QUESTION 3
A customer wants to place their NSX Managers in different subnets.
Which would an architect recommend to support the request? (Choose the best answer.)
- A. Use a load balancer.
- B. Use round-robin DNS.
- C. Use NAT.
- D. Use a cluster Virtual IP.
Answer: D
NEW QUESTION 4
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop:
There are six hosts and hardware has already been purchased.
Customer is planning a collapsed Management/Edge/Compute cluster.
Each host has two 10Gb NICs connected to a pair of switches.
There should be no single point of failure in any proposed design.
Which virtual switch design should the architect recommend to the organization? (Choose the best answer.)
- A. Create a vSphere Distributed Switch (vDS) for Management VMkernel traffic and assign one NI
- B. Also, create an NSX-T Virtual Distributed Switch (N-VDS) for overlay traffic and assign one NIC.
- C. Create an NSX-T Virtual Distributed Switch (N-VDS) for Management VMkernel traffic and assign one NI
- D. Also, create an NSX-T Virtual Distributed Switch (N-VDS) for overlay traffic and assign one NIC.
- E. Create an NSX-T Virtual Distributed Switch (N-VDS) for Management VMKernel and overlay traffic and assign both NICs.
- F. Create an NSX-T Virtual Distributed Switch (N-VDS) for Management VMkernel and overlay traffic and assign a new virtual NIC.
Answer: A
NEW QUESTION 5
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which risk was documented by the architect? (Choose the best answer.)
- A. Network administrators are not familiar with NSX-T Data Center solutions.
- B. Dynamic routing should be configured between the physical and virtual network.
- C. There are applications which use IPv6 addressing.
- D. There is a storage array available to deploy NSX-T components.
Answer: B
NEW QUESTION 6
Which selection must be taken into consideration when creating a Logical Design for a planned migration? (Choose the best answer.)
- A. An N-VDS can only attach to a single Overlay transport zone.
- B. An N-VDS can only attach to a single VLAN transport zone.
- C. An N-VDS can attach to both an Overlay and a VLAN transport zone to a N-VDS having different name/s.
- D. An N-VDS must be disabled before attaching both Overlay and VLAN transport zones.
Answer: B
NEW QUESTION 7
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop:
Any proposed solution must provide low latency.
Any proposed solution must provide high throughput.
Customer is running stock trading applications.
Which two selections should the architect recommend to meet high-performance workload requirements?
(Choose two.)
- A. Leverage ESXi as the compute host.
- B. Use LACP for all uplink profiles.
- C. Leverage KVM as the compute host.
- D. Enable enhanced data path mode on the N-VDS.
- E. Enable latency sensitivity mode on the N-VDS.
Answer: AD
NEW QUESTION 8
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
Customer currently has a single 10 host vSphere cluster.
Customer wants to improve network security and automation.
Current cluster utilization and business policies prevent changing the existing vSphere deployment.
High-availability is important to the customer.
Which three selections should the architect include in their design? (Choose three.)
- A. Apply vSphere DRS VM-Host anti-affinity rules to the virtual machines of the NSX-T Edge cluster.
- B. Deploy at least two NSX-T Edge virtual machines in the vSphere cluster.
- C. Deploy the NSX Controllers in the management cluster.
- D. Apply vSphere Distributed Resource Scheduler (vSphere DRS) VM-Host anti-affinity rules to NSX Managers.
- E. Remove 2 hosts from the cluster and create a new edge cluster.
- F. Remove vSphere DRS VM-Host affinity rules to the NSX-T Controller VMs.
Answer: ACE
NEW QUESTION 9
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop:
Current hypervisor of choice is KVM.
Cost reduction is important.
Which two selections should the architect recommend to the organization? (Choose two.)
- A. Deploy Edge VM Nodes using ISO.
- B. Deploy NSX Manager using OVF.
- C. Deploy NSX Manager using QCOW2.
- D. Deploy bare metal Edge Nodes.
- E. Deploy Edge VM Nodes on KVM.
Answer: CD
NEW QUESTION 10
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.
During discussions about centralized services NAT running on Tier-1 or Tier-0 Gateway, the customer made these requests:
Services contain stateful services.
Services should be in high availability mode.
Which two selections should the architect include in their design? (Choose two.)
- A. An active/active model should be used.
- B. Use Reflexive NAT on the uplink interface.
- C. DNAT should be applied on the uplink interface.
- D. Mix stateful and stateless NAT rules on the same gateway.
- E. The high availability mode supported is only Active-Standby.
Answer: DE
NEW QUESTION 11
Which three assessment findings are part of a Conceptual Design? (Choose three.)
- A. risks
- B. host names
- C. justifications
- D. constraints
- E. assumptions
- F. vendor model
Answer: ACD
NEW QUESTION 12
Which two benefits can be achieved using in-band management of an NSX Bare Metal Edge Node? (Choose two.)
- A. Reduces storage requirements.
- B. Reduces cost.
- C. Preserves packet locality.
- D. Reduces egress data.
- E. Preserves switchports.
Answer: BD
NEW QUESTION 13
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during a workshop:
The company will use a Leaf and Spine physical network architecture with Layer 3 gateways for top of rack switches.
The company is planning to deploy 120 ESX hosts across 10 racks.
There will be a total of a 12 clusters where each cluster has one host per rack.
What should the architect recommend to allow applications to run on any host in the cluster? (Choose the best answer.)
- A. Deploy all application networks on NSX segments.
- B. Deploy an L2 VPN to allow the networks to extend to each host.
- C. Deploy a Tier-0 gateway per Rack and configure BGP between racks.
- D. Deploy a Tier-1 gateway per Rack and configure BGP between racks.
Answer: D
NEW QUESTION 14
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:
Maximum performance and availability is required between the physical and virtual network.
Load Balancing service is required for back-end web servers.
NAT is required.
Which selection should the architect include in their design? (Choose the best answer.)
- A. Deploy a Tier-1 gateway and connect it to an Active/Active Tier-0 gateway with ECMP configured.
- B. Deploy an Active/Active Tier-0 gateway and configure ECMP.
- C. Deploy an Active/Standby Tier-0 gateway and configure ECMP.
- D. Create two separate VLANs to connect the Tier-0 gateway upstream traffic and configure ECMP.
Answer: C
NEW QUESTION 15
Which NSX-T feature is used to allocate the network bandwidth to business-critical applications and to resolve situations where several types of traffic compete for common resources? (Choose the best answer.)
- A. Network I/O Control Profiles
- B. LLDP Profile
- C. LAG Uplink Profile
- D. Transport Node Profiles
Answer: A
NEW QUESTION 16
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. This information was gathered by the architect during the Discover Task of the Enagagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which constraint was documented by the architect? (Choose the best answer.)
- A. Dynamic routing should be configured between the physical and virtual network.
- B. There are applications which use IPv6 addressing.
- C. Hosts can only be configured with two physical NICs.
- D. There are enough CPU and memory resources in the existing management cluster.
Answer: A
NEW QUESTION 17
Which two resources can be used by an NSX architect during the Assessment Phase? (Choose two.)
- A. vRealize Network Insight
- B. VMware Validated Design
- C. VMware customer references
- D. key stakeholder interviews
- E. application licensing
Answer: AE
NEW QUESTION 18
A Solutions Architect is assisting a service provider with designing an NSX-T Data Center solution for these environments:
Virtual Data Center to Virtual Data Center connectivity Tenant workload on-boarding to Virtual Data Centers. These requirements must be met:
scalability across 5 data centers
all sites have a latency of 180ms
MTU between sites is 1800
bandwidth is 100Mbps between sites
multi-tenancy
Which two selections should the Solutions Architect propose to the service provider? (Choose two.)
- A. Configure Remote TEPs for stretching network services between Virtual Data Centers.
- B. Utilize SSL VPN for workloads on-boarding from on-premises to Virtual Data Centers.
- C. Configure IPSec VPN for Tenant T0 gateways for Virtual Data Centers connectivity
- D. Configure IPSec VPN for Tenant T1 gateways for Virtual Data Centers connectivity.
- E. Utilize L2 VPN for workloads on-boarding from on-premises to Virtual Data Centers.
Answer: DE
NEW QUESTION 19
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. Which two statements should the architect consider as non-technical requirements? (Choose two.)
- A. Any solution should add more value to current and future customers engagements.
- B. The design should offer agility and freedom for application phases.
- C. All application servers have hardcoded IP addresses.
- D. Current business continuity and disaster recovery plans are based on tape technology.
- E. Different vendors are used for the storage solution.
Answer: BD
NEW QUESTION 20
Which three choices are part of a Design Approach when discussing design alternatives and their effects? (Choose three.)
- A. backup
- B. budget
- C. cost
- D. performance
- E. knowledge
- F. security
Answer: DEF
NEW QUESTION 21
Refer to the exhibits.
Design Option1:
Design Option 2:
Design Option 3:
Design Option 4:
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution. The conceptual design includes these requirements, assumptions, constraints, and risks:
Critical applications must run across sites without changing IP address.
RTO/RPO must be reduced for recovery of applications on secondary site.
IT Teams require automation tools for configuration.
Which Conceptual Design would the architect recommend to the customer? (Choose the best answer.)
- A. Design Option 4
- B. Design Option 2
- C. Design Option 1
- D. Design Option 3
Answer: C