Passleader offers free demo for OG0-093 exam. "OG0-093 TOGAF 9 Combined Part 1 and Part 2", also known as OG0-093 exam, is a The-Open-Group Certification. This set of posts, Passing the The-Open-Group OG0-093 exam, will help you answer those questions. The OG0-093 Questions & Answers covers all the knowledge points of the real exam. 100% real The-Open-Group OG0-093 exams and revised by experts!

Free OG0-093 Demo Online For The-Open-Group Certifitcation:

NEW QUESTION 1

Scenario:
Please read this scenario prior to answering the question
The ABC company is the prime contractor for the Telesto Unmanned Spacecraft program. Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The company is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, the company needs to define Baseline and Target Architectures. These architectures must address key stakeholders' concerns such as:
* 1. What groups of people should be involved in procurement-related business processes?
* 2. What current applications do those groups use?
* 3. Which procurement-related business processes are supported by zero, one, or many existing applications?
* 4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects? What
non-procurement applications will need to be integrated with any new procurement applications?
* 5. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle. The company is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Refer to the Scenario.
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation. Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Baseline Business Process catalogDescribe the Baseline Application Architecture with a Technology Portfolio catalogDescribe the Baseline Data Architecture with a Data diagramIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Actor/Process/Data catalogDescribe the Target Application Architecture with a System/Technology matrixDescribe the Target Data Architecture with a Data Dissemination diagram
  • B. In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the key business objects with Product Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a Data Entity/business Function matrix and a System/Data matrixIn the later iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the Baseline Application Architecture with a System/Organization matrix and a System/function matrixDescribe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • C. In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalogDescribe the key business objects with Data Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrixIn the later iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrixDescribe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • D. In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with an Organization/Actor catalogDescribe the Baseline Application Architecture with a System/Function matrixDescribe the Baseline Data Architecture using a Data Entity/Data Component catalogIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Organization/Actor catalogDescribe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrix

Answer: C

NEW QUESTION 2

Which of the following statements best describes the Requirements Management process?

  • A. The review of business requirements within the TOGAF ADM
  • B. The prioritization and disposal of architecture requirements
  • C. The management of architecture requirements throughput the ADM cycle
  • D. The development of requirements that deliver business value
  • E. The development of requirements for ADM Phase A

Answer: C

Explanation:
References:

NEW QUESTION 3

Complete the sentence. In the TOGAF Architecture Content Framework, an artifact that is a list of things is known as a _______ .

  • A. building blocks
  • B. matrix
  • C. catalog
  • D. deliverable
  • E. diagram

Answer: C

NEW QUESTION 4

Which of the following best describes the concept of Boundaryless Information Flow?

  • A. Enabling the vision of an integrated information infrastructure
  • B. Getting information to the right people at the right time in a secure, reliable and timely manner
  • C. Enabling effective global communications between countries
  • D. Enabling the flow of information to all stakeholders
  • E. Providing a visual representation of information provider, consumer and brokering applications

Answer: B

NEW QUESTION 5

Which of the following statements does NOT correctly describe Architecture Principles?

  • A. They are most effective when they are embraced and used across the organization
  • B. They are based on enterprise principles
  • C. They are detailed policies that prescribe behaviors and requirements
  • D. Even though they may appear generic, they should be tailored to reflect an organization's culture and goals

Answer: C

NEW QUESTION 6

Which of the following is an interest important to a stakeholder in a system?

  • A. A concern
  • B. A principle
  • C. An architecture viewpoint
  • D. A requirement
  • E. An architecture view

Answer: A

Explanation:
Concerns are the key interests that are crucially important to the stakeholders in the system, and determine the acceptability of the system. Concerns may pertain to any aspect of the system's functioning, development, or operation, including considerations such as performance, reliability, security, distribution, and evolvability.
Reference
http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap31.html

NEW QUESTION 7

An association of companies has defined a data model for sharing inventory and pricing information. Which of the following best describes where this model would fit in the Architecture Continuum?

  • A. Foundation Architecture
  • B. Common Systems Architecture
  • C. Industry Architecture
  • D. Organization Specific Architecture
  • E. Product Line Architecture

Answer: C

NEW QUESTION 8

Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key
electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common
off-the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer’s concern.
Based on the TOGAF standard, which of the following is the best answer?

  • A. You create an Architecture Contract to manage and govern the implementation and migration proces
  • B. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contrac
  • C. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
  • D. You use the Architecture Contracts to manage the architecture governance processes for the project across the location
  • E. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local need
  • F. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • G. You create an Architecture Contract to manage and govern the implementation and migration process at each locatio
  • H. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organizatio
  • I. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • J. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk managemen
  • K. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedulecompliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definitio
  • L. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

Answer: A

NEW QUESTION 9

Scenario
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for an insurance company, which has been formed through the merger of three previously independent companies. The company now consists of three divisions with the same names and division headquarters as their predecessors.
The lack of integration between the three divisions has increasingly caused problems in the handling of customer and financial information. The inability to share information has resulted in lost opportunities to leverage the synergies that should have been possible as a result of the merger. At present, each division maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, and claims information, each division has different ways of defining these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, the company has made the decision to introduce a common web portal, contact center software suite, and document management system. Also the company has selected a single enterprise-wide customer relationship management (CRM) application to consolidate information from several applications that exist across the divisions. The application will be used by each of the divisions and accessed by third party partners through well defined interfaces.
The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the migration teams in each division. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.
TOGAF 9 has been selected as the core framework for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.
Refer to the Scenario
As part of the process for establishing the Enterprise Architecture department, you are developing a set of architecture principles to guide the activities.
You need to recommend the best approach for this work. Based on TOGAF, which of the following is the best answer?

  • A. You would review the mission statements for the company and its divisions, together with the corporate business goals and business driver
  • B. Based on that review, you would work closely with the key stakeholders and the Architecture Board to define the architecture principle
  • C. You would ensure that they actively promote the alignment of IT with the corporate business strategie
  • D. You would then hold review meetings with the relevant stakeholders, including senior management, ensuring their support.
  • E. You would gather information from credible industry sources in the insurance busines
  • F. Based on that information, you would assess current trends and apply them to defining a set of principles that embody best practice
  • G. You would select architecture principles that do not conflict with each other and that should be stabl
  • H. You would ensure that all the principles are realistic and avoid including principles that are too obvious.
  • I. You would analyze the mission statements for the company and each of its divisions, together with the corporate business goal
  • J. Based on that analysis, you would define a set of architecture principles and review them with the CI
  • K. When developing the principles, you would ensure that they actively promote the alignment of IT with the business strategies and initiatives of the compan
  • L. You would then seek the endorsement of the CIO and senior management.
  • M. You would define a set of principles that support the preferred best practices embodied in the Enterprise Architecture department charte
  • N. You would publish the principles on the corporate intranet to ensure widespread acceptance and complianc
  • O. You would then schedule regular periodic Compliance Assessments with each of the divisions to check that they have made satisfactory progress toward meeting the objectives and conditions embodied in the principles.

Answer: A

NEW QUESTION 10

Which of the following are considered as generic Building Blocks in the Solutions Continuum?

  • A. Common Systems Solutions
  • B. Foundation Solutions
  • C. Industry Solutions
  • D. Organization-Specific Solutions
  • E. Strategic Solutions

Answer: B

NEW QUESTION 11

In which section of the TOGAF template for Architecture Principles would a reader find the answer to the question of 'How does this affect me"?

  • A. Implications
  • B. Name
  • C. Rationale
  • D. Statement

Answer: A

NEW QUESTION 12

Which ADM phase defines the scope for the architecture development initiative and obtains approval to proceed with the architecture development?

  • A. Phase D: Technology Architecture
  • B. Phase A: Architecture Vision
  • C. Requirements Management
  • D. Phase B: Business Architecture
  • E. Preliminary Phase

Answer: B

Explanation:
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap06.html

NEW QUESTION 13

What class of architectural information within the Architecture Repository defines processes that support governance of the Architecture Repository?

  • A. Architecture Capability
  • B. Architecture Landscape
  • C. Architecture Metamodel
  • D. Governance Log
  • E. Reference Library

Answer: A

NEW QUESTION 14

Which part of TOGAF describes taxonomies for categorizing the outputs of architecture activity in terms of reuse?

  • A. ADM Guidelines and Techniques
  • B. Architecture Capability Framework
  • C. Architecture Development Method
  • D. Enterprise Continuum & Tools

Answer: D

NEW QUESTION 15

Which of the following best describes the need for the ADM process to be governed?

  • A. To enable development of reference architectures
  • B. To enable a fast response to market changes
  • C. To build a top-down, all-inclusive architecture description
  • D. To permit the architecture domains to be integrated
  • E. To verify that the method is being applied correctly

Answer: E

NEW QUESTION 16

Scenario:
Please read this scenario prior to answering the Question
You are serving as the Chief Architect for a large, global commodities trading company which has been growing rapidly through a series of acquisitions.
Each business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to "leverage the synergies" that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, the company has made the decision to introduce a single enterprise-wide application to consolidate information from several applications that exist across the lines of business. The application will be used by all business units and accessed by suppliers through well defined interfaces.
The Corporate Board is concerned that the new application must be able to manage and safeguard confidential customer information in a secure manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services in cooperation with its trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Board to oversee and govern the architecture. The company has an existing team of security architects.
TOGAF 9 has been selected for use for the Enterprise Architecture program. The CIO has endorsed this choice with the full support of top management.
Refer to the Scenario
In the Preliminary Phase you need to define suitable policies and ensure that the company has the appropriate capability to address the concerns of the Corporate Board.
Based on TOGAF 9, which of the following is the best answer?

  • A. You start by clarifying the intent that the Board has for raising these concern
  • B. This enables you to understand the implications of the concern in terms of regulatory requirements and the potential impact on current business goals and objective
  • C. You propose that a security architect or security architecture team be allocated to develop a comprehensive security architecture and that this be considered an additional domain architecture.
  • D. You evaluate the implications of the Board's concerns by examining the security and regulatory impacts on business goals, business drivers and objective
  • E. Based on your understanding, you then update the current security policy to include an emphasis on the concern
  • F. You define architecture principles to form constraints on the architecture work to be undertaken in the projec
  • G. You then allocate a security architect to ensure that security considerations are included in the architecture planning for all domains.
  • H. You identify and document the security and regulatory requirements for the application and the data being collecte
  • I. You ensure that written policies are put in place to address the requirements, and that they are communicated across the organization, together with appropriate training for key employee
  • J. You identify constraints on the architecture and communicate those to the architecture tea
  • K. You establish an agreement with the security architects defining their role within the ongoing architecture project.
  • L. You evaluate the implications of the concerns raised by the Corporate Board in terms of regulatory requirements and their impact on business goals and objective
  • M. Based on this understanding, you then issue a Request for Architecture Work to commence an architecture development project to develop a solution that will address the concern
  • N. You allocate a security architect to oversee the implementation of the new application that is being developed.

Answer: B

Explanation:
Incorrect:
Not C: Implied that solution needs be developed to address the concern, instead of address the concern in the ERP solution itself.

NEW QUESTION 17

Complete the sentence. The TOGAF Architecture Governance Framework includes .

  • A. a list of responsibilities for running an Architecture Board
  • B. a model for governance including process, content and context
  • C. guidance for establishing an Architecture Capability using the ADM
  • D. the Architecture Compliance review process and checklists

Answer: B

NEW QUESTION 18

Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Chief Enterprise Architect within a leading North American information technology services company. The company has a number of service portfolios including infrastructure, applications, business process outsourcing, accounting, and financial services.
With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management within the company has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings.
The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of an Enterprise Architecture prog-am based on TOGAF 9. An Architecture Board has been formed comprised of IT staff executives and executives from the major practice areas.
The Enterprise Architecture team has been working with the Strategic Planning team to create a strategic enterprise architecture to address these issues. The team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This includes a solution architecture including three distinct transformations.
The CIO has made it clear that prior to the approval of the detailed Implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the senior partners that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.
Refer to the Scenario
You have been asked to recommend an approach to satisfy these concerns. Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D to understand the transformations that are required to achieve the proposed Target Architectur
  • B. The EA team should assess the readiness of the organization to undergo chang
  • C. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.
  • D. You recommend that the EA team apply an interoperability analysis to evaluate any potential issues across the Solution Architectur
  • E. This should include the development of a matrix showing the interoperability retirement
  • F. Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.
  • G. You recommend that the EA team apply the Business Transformation Readiness Assessment technique which will allow the risks associated with the transformations to be identified and mitigated for, it willalso identify improvement actions to be worked into the Implementation and Migration Pla
  • H. A Business Value Assessment should be used to determine the business value and associated risks for the transformation.
  • I. You recommend that the EA team should gather information about potential solutions from the appropriate source
  • J. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architecture
  • K. A value realization process should then be established to ensure that the concerns raised are addressed.

Answer: B

NEW QUESTION 19

Scenario
Please read this scenario prior to answering the question
Your role is that of the Lead Architect working for a government agency responsible for immigration, customs, and border control. The agency was formed by consolidating several smaller government agencies. The agency has established an Enterprise Architecture practice based on TOGAF 9. The CIO is the executive sponsor and has appointed an EA steering team to oversee the practice.
There has been a considerable increase in security requirements and immigration service requests in recent years, which have expanded the scope and size of the operations of the agency. As a result, the existing Information Technology architecture no longer meets the required service levels. A significant Enterprise Architecture (EA) initiative is in progress with the opal to improve customer responsiveness and satisfaction, and improve the overall operational efficiency of the agency.
The current EA staff members were internal appointments based on a request from the EA steering team to supply a number of suitable individuals for the EA effort. Collectively, they possess a broad range of IT and business analysis skills. However, the CIO has expressed concern about the diverse range of experience within the team. There is concern that the EA staff may be lacking in some of the critical skills that are required to properly conduct EA activities. It had been assumed that any EA-related skill gaps would be overcome by on-the-job mentoring from the senior members of the EA staff. Each architect was expected to attend a TOGAF training course and participate in other skill development activities.
A recent review of the EA program revealed that many EA staff members, despite attending multi-day training courses, were not proficient in analyzing or creating the models and artifacts required for their assigned architecture projects. Stakeholders have observed errors and inconsistencies in artifacts and deliverables being submitted for review.
Refer to the Scenario
The CIO has asked you to recommend a professional development plan for the EA staff in order to address the findings raised in the recent review.
Based on TOGAF, which of the following is the best answer?

  • A. You recommend that a comprehensive evaluation of key team leader skills be made using the TOGAF Architecture Skills Framewor
  • B. Based on the evaluations, you will recommend the necessary staff change
  • C. This will ensure that the team leaders have the necessary skills and experience for the architecture tasks within the agenc
  • D. The role and skill categories defined in the TOGAF Architecture Skills Framework should then be shared with the department leaders so that in the future, they can make more informed choices when providing internal candidates for the EA team.
  • E. You recommend that an architecture maturity assessment should be conducte
  • F. This will identify the practices on which the agency should focus to see the greatest improvement and ensure that the basic enterprise architecture process is documente
  • G. As part of the assessment, all of the team leaders should be interviewed and their qualifications assesse
  • H. In order to rectify areas of low proficiency, they are expected to attend additional EA training course
  • I. When the team leaders have achieved the desired levels of proficiency, they should apply a similar process for their staff members.
  • J. You recommend that you work with the EA steering team to adapt the TOGAF Architecture Skills Framework for use within the architecture practice at the agenc
  • K. The categories of architecture roles, the required skills for each role and the desired level of proficiency for each role and skill will be defined by this framewor
  • L. Each team member, or prospective team member, can then be evaluated for suitability against these roles and skill
  • M. Staffing and training adjustments can then be made as necessary to close gaps that are discovered.
  • N. You recommend that to address the issues identified in the review, the experienced team leaders should mentor the junior team member
  • O. At the same time additional training should be provide
  • P. Since it is now known that some models are improperly defined and may have caused cascading errors in other parts of the architecture, you recommend an iteration of the Migration Planning phase occur, so as to develop a coordinated transition to a new baseline using the last known good architectur
  • Q. Once the artifacts are consistent and correct, these can be applied to this new baseline.

Answer: C

NEW QUESTION 20

What part of the Architecture Repository shows the building blocks that are currently in use within the organization?

  • A. Architecture Landscape
  • B. Architecture Metamodel
  • C. Governance Log
  • D. Reference Library
  • E. Standards Information Base

Answer: A

NEW QUESTION 21

Which of the following describes the TOGAF classification in Phase H for a simplification change?

  • A. A change driven by a requirement to derive additional value from the existing investment
  • B. A change driven by a requirement to increase investment in order to create new value for exploitation
  • C. A change driven by a requirement to reduce investment
  • D. A change driven by a requirement to re-align with the business strategy
  • E. A change driven by a requirement to simplify communication between stakeholders

Answer: C

NEW QUESTION 22

Which model within TOGAF is closely related to the concept of Boundaryless Information Flow?

  • A. The ARTS data model
  • B. The Architecture Governance Framework
  • C. The Enterprise Continuum
  • D. The Integrated Information Infrastructure Model
  • E. The TOGAF Technical Reference Model

Answer: D